Seah Boon Kee

Non-Independent Executive Director

Seah Boon Kee, a Malaysian male, aged 48, is our Non-Independent Executive Director and Deputy Managing Director. He is our co-founder and was appointed to our Board on 21 August 2024. He is responsible for our Group’s construction management, machinery and equipment, and procurement functions.

He graduated with a Bachelor of Engineering in Civil and Coastal Engineering (Honours) from the University of Plymouth, United Kingdom in 2000. He is a Graduate Engineer with the Board of Engineers Malaysia since 2001 and a Graduate Member of the Institution of Engineers Malaysia since 2002.

He started his career in 2000 when he joined KTA (Sarawak) Sdn Bhd as a Design Engineer where he was involved in the construction of the Limbang Airport and several hospitals, as well as the design of a diversion channel for flood mitigation in Sarawak. 

In 2002, he left KTA (Sarawak) Sdn Bhd to join Inai Kiara Sdn Bhd as a Civil Engineer where he was involved in various projects including the Pelabuhan Tanjung Pelepas – Phase II at Gelang Patah in Johor and the Second Inner Harbour, Bintulu Port in Sarawak. He was promoted to Project Manager in 2006 and oversaw various projects in Sarawak, namely the ASSAR Palm Oil Refinery at Senari, Kuching; the Sekolah Asrama Latihan Kesihatan & Complex Block 46 at Kuching; the Jalan Sibu/Bawang Assan/Seredeng Package II (Sungai Setubah to Batang Seredeng) and the Kuching City Flood Mitigation Work (Phase 1 – Stage 1). He left as a Senior Project Manager in 2012.

In 2012, he joined Naim Land Sdn Bhd, a subsidiary of Naim Holdings Berhad as a Senior Project Manager where he was responsible for project management. In the same year, he was promoted as Project Director and seconded to Vista Megalink Sdn Bhd where he was also responsible for project management, and subsequently promoted as Head of Construction in 2015. During his tenure with Naim Group, he was involved in various construction and infrastructure projects including the refurbishment and improvement of the Tanjung Manis Port at Mukah, Sarawak, the Tanjung Manis Water Supply Project – Phase 1 at Sibu, Sarawak, and the Sg. Buloh – Kajang Mass Rapid Transit project (Package S2 and S4) at Selangor. In 2016, he left Naim Group and joined Hartanah Construction which he co-founded in 2010 with his younger brother, Seah Boon Tiat.